Review Accessible Framing and Rough-Ins
We inspect visible framing and applicable plumbing, electrical and HVAC rough-in components within the agreed scope.
Document Items for Builder Review
Observed concerns are recorded so you can raise them with the builder before the relevant areas are covered.
Arrange the Right Construction Stage
We discuss readiness and access so the inspection can take place when relevant components are exposed.
Receive Photos and Explanations
Your report documents observed conditions and recommendations for further evaluation or correction where appropriate.

Coordinate
Confirm Readiness and Access
We discuss the builder’s schedule and whether the property is ready for inspection.
Inspect
Review Exposed Components
We examine accessible framing and rough-ins included in the service.
Report
Document Observed Concerns
We prepare findings with photographs and relevant explanations.
Review
Prepare for Builder Discussions
We answer questions so you can raise documented concerns with the builder.

If you need a home inspection ClearVue is the place to call. Ryan Pigg was our inspector on a new home being built. He was excellent. Very detailed and explained what he found in a manner we could easily understand. Super nice guy!
— Debbie Lytton
Contact us before the builder plans to install drywall. The relevant rough-ins should be sufficiently complete and exposed for the agreed inspection.
It reviews accessible framing and applicable electrical, plumbing and HVAC rough-ins within the agreed scope.
Arrange authorized access with your builder or site representative. We also need to understand any site requirements before attending.
No. It is an independent inspection and does not replace required construction inspections or approvals.
Let us know as soon as possible. We will discuss availability and whether the inspection can still take place before concealment.
Covered components cannot be visually assessed in the same way. We document relevant access limitations.
Yes. The report documents observed findings with supporting photographs.
The inspection identifies observed concerns. You or your representative should discuss correction arrangements directly with the builder.
A return visit is a separate scheduling and scope question. Ask us to confirm availability and pricing if you want identified items reviewed again.
A final inspection reviews components and operation that may not be complete at the pre-drywall stage. The two inspections serve different purposes.
616 E Westinghouse Blvd #116, Pineville, NC 28134, United States
© 2025 ClearVUE Home Inspection. All rights reserved.

Call: +1 980-485-7738